O
Perrysburg
← Perrysburg

Perrysburg · issues

Civic issues

Topics getting the most attention in Perrysburg public meetings, ranked by how frequently they come up.

16 issues (filtered)15 topics
LowRoads

Eckel Road Vacation

A small stub of city right-of-way on Eckel Road, long used as the Michaels property entrance, would be vacated so the owner can maintain and upgrade it.

2 mentions (2 this month)Last discussed Nov 3, 2026
HighRoads

SR 25 and Eckel Junction intersection improvement

The city will pay $6,900 extra to have Mannik & Smith evaluate an idea to improve the rough SR 25/Eckel Junction intersection as part of the corridor study update.

3 mentions (2 this month)Last discussed Oct 29, 2026
HighRoads

Front Street speed limit fix

Front Street has shown 35 mph signs for years, but the limit was never filed with the state — legally it's 45 or 50. A resolution will make 35 official, and a corridor study may push it lower.

2 mentions (2 this month)Last discussed Oct 20, 2026
MediumRoads

Pedestrian Safety at I-75 Overpass (Route 20)

A resident raised concerns again about pedestrians and cyclists crossing the Route 20 bridge over I-75. Staff will look at signage and grant options; a real fix would likely wait for an ODOT bridge replacement that isn't planned anytime soon.

1 mention (1 this month)Last discussed Oct 20, 2026
MediumRoads

Fort Meigs Road Multi-Use Path

Council accepted donated land from the schools and a title agency and dedicated park land at Rivercrest and Rotary parks so the safety-funded path along Fort Meigs Road, W. Indiana and Hull Prairie can go out to bid on schedule.

2 mentions (1 this month)Last discussed Oct 6, 2026
HighRoads

ODOT grants for Louisiana Avenue resurfacing and shared-use paths

Council applied for a federal grant to resurface East Indiana Avenue and accepted two ODOT grants covering 80-90% of costs for SR-199 resurfacing and new shared-use paths and crossings on West Indiana, Fort Meigs and Hull Prairie roads. Construction bids are expected late 2026 into 2027.

4 mentions (1 this month)Last discussed Oct 6, 2026
LowRoads

Garmin marathon traffic impacts

The Garmin Run comes through town Sunday, September 20 — expect Front Street and bridge traffic delays until about noon; churches along the route were notified in advance.

1 mentionLast discussed Sep 15, 2026
HighRoads

East Indiana Avenue resurfacing grant application

Council authorized applying for competitive state OPWC grant money to resurface Finley Street from Mulberry Road to Indiana Avenue.

2 mentionsLast discussed Sep 1, 2026
HighRoads

Front Street corridor roundabouts

Residents packed citizens' comments to oppose proposed roundabouts on Front Street and East Boundary, calling them unnecessary, costly and a threat to the historic district's character. The mayor stressed it's only a safety study so far — no decision has been made — and public input is still open online.

4 mentionsLast discussed Aug 4, 2026
LowRoads

Front Street project public comment

There's still time to weigh in on the Front Street project — scan the QR code online or on social media before the August 4 Council meeting.

1 mentionLast discussed Jul 27, 2026
HighRoads

Downtown construction update

Downtown work flips to the west side soon, but corners at Front Street, Second Street and the railroad tracks wait on late-arriving anchor bolts and Toledo Edison de-energizing old traffic cabinets.

3 mentionsLast discussed Jul 7, 2026
MediumRoads

Downtown Construction Phase Change

Construction starts this month downtown, but all shops stay open and the Farmers Market remains, flipping to whichever side of the street isn't torn up.

2 mentionsLast discussed Jun 16, 2026
MediumRoads

State Route 25 corridor study

The city hasn't updated its Route 25 traffic study since 2017, and lots of development is happening along that corridor. Council hired Mannik Smith Group to refresh it for up to $89,960.

1 mentionLast discussed May 19, 2026
HighRoads

2026 Street Resurfacing and Road Program

Council awarded the year's biggest construction contract — nearly $1.8 million to resurface various city streets — plus striping and sidewalk work. Expect orange barrels and smoother roads this construction season.

1 mentionLast discussed Apr 21, 2026
HighRoads

2026-2027 Infrastructure Projects

A slate of road, watermain, signal, and multi-use path projects is coming, including resurfacing 12 streets, Indiana Avenue reconstruction, and downtown streetscape Phase Two.

1 mentionLast discussed Mar 9, 2026
MediumRoads

Ft. Meigs Road and Coe Court Traffic Signal

A new signal at Ft. Meigs Road and Coe Court, where Hawthorn Subdivision traffic has grown sharply. The developer reimburses up to half the $322,452 cost, softening the hit to city coffers.

1 mentionLast discussed Jan 28, 2026