O
Perrysburg
← Perrysburg

Perrysburg · issues

Civic issues

Topics getting the most attention in Perrysburg public meetings, ranked by how frequently they come up.

19 issues (filtered)15 topics
HighWater Utilities↑Rising

Sanitary Sewer Credits

A homeowner was told by city technicians that a leak on his water service line needed repair, spent about $1,968 on excavation, and no leak was ever found. The city declined reimbursement, saying the leak would have been on the homeowner's side of the curb stop, but committee members acknowledged communication could have been better.

4 mentions (3 this month)Last discussed Nov 3, 2026
HighWater Utilities

SSO Elimination Plan and Ohio EPA DFFO Compliance

The city will submit its sewer overflow elimination plan to the Ohio EPA, with eight projects over 20 years starting in 2028. Meanwhile, Arcadis was picked from nine bidders for the $411,400 construction engineering contract to replace old four-inch cast iron water mains on Front, Second, Third Streets and Indiana Avenue.

3 mentions (1 this month)Last discussed Oct 26, 2026
HighWater Utilities

Front, Second and Third Street watermain improvements

Council reauthorized the state revolving loan agreement for the watermain replacement so the project can proceed.

2 mentions (1 this month)Last discussed Oct 6, 2026
HighWater Utilities

Water and Sewer Rate Increases

A rate study recommends 2% annual increases for five years, taking effect January 1, 2027 — first readings were introduced, with votes to come.

2 mentions (1 this month)Last discussed Oct 6, 2026
HighWater Utilities

Watermain replacement on Front, Second, Third and Indiana

A $3.3 million project will replace water mains using directional drilling — boring under yards instead of open-trenching — to spare trees, driveways and sidewalks. The low bidder complained the award costs $862,082 more than his bid; council weighed the trade-off and approved it anyway.

3 mentions (1 this month)Last discussed Oct 6, 2026
MediumWater Utilities

New water and sewer rates

First readings of ordinances updating water and sewer rate structures — the actual rate numbers and vote are still to come, likely later in October.

1 mention (1 this month)Last discussed Oct 6, 2026
HighWater Utilities

Stormwater Fee Start-Up

The new stormwater fee begins January 1, 2027, alongside the water and sewer rate increases.

2 mentionsLast discussed Sep 28, 2026
MediumWater Utilities

Watermain Replacement Project

The Front, Second and Third Street watermain project moves forward with $79,000 in materials and a re-signed Ohio EPA loan.

1 mentionLast discussed Sep 28, 2026
MediumWater Utilities

Water main replacement on Front, Second, Third Streets

Utilities reported a water main replacement project starting this fall covering 10,400 feet on Front, Second, and Third Streets, and reminded residents a $6 monthly stormwater fee starts January 2027.

2 mentionsLast discussed Sep 1, 2026
MediumWater Utilities

Wastewater treatment plant primary clarification expansion

A $484,500 design and bidding services contract with Fishbeck would move the wastewater plant expansion forward.

1 mentionLast discussed Aug 4, 2026
MediumWater Utilities

Stormwater utility launching January 2027

After two years of work, the city will roll out a stormwater utility in January to fund flood fixes and infrastructure repairs — adding $6 a month to residential utility bills. Lots more information is coming this fall.

4 mentionsLast discussed Aug 4, 2026
MediumWater Utilities

Wastewater plant primary clarification expansion

The treatment plant needs more primary clarification capacity to handle current and future flows. Fishbeck will design it.

1 mentionLast discussed Jul 27, 2026
MediumWater Utilities

Stormwater utility fee outreach

A $6-a-month stormwater fee starts January 2027. City staff are preparing public outreach so residents know what's coming and can ask questions.

1 mentionLast discussed Jul 27, 2026
MediumWater Utilities

Stormwater Utility Program Enterprise Fund

First reading of a resolution creating a dedicated fund so all stormwater service charges are used only for the stormwater program.

4 mentionsLast discussed Jun 16, 2026
LowWater Utilities

Wastewater plant digester project on track

Councilmembers toured the wastewater treatment plant digester upgrade and reported progress is on track — and a nearby resident councilmember says odors have been better than expected.

1 mentionLast discussed Jun 2, 2026
MediumWater Utilities

Senior Loft Watermain Extension and W. 6th Street Fire Protection

A water main extension on West Sixth Street will serve the Perrysburg Senior Lofts project and improve fire protection in the area.

2 mentionsLast discussed May 19, 2026
HighWater Utilities

Reservoir pressure valve replacement

Two 60-plus-year-old valves that keep water pressure right at the city's reservoirs are failing — one is already dead. Council will decide on replacements to protect the water distribution system.

1 mentionLast discussed Apr 27, 2026
MediumWater Utilities

Natural gas aggregation extension with Archer Energy

Eligible residents and small businesses stay in the city's group-buy natural gas program for another term under the extended Archer Energy deal.

1 mentionLast discussed Mar 3, 2026
HighWater Utilities

Ft. Meigs Ditch Repair and Multi-Use Path

A $2.6 million project to repair the Ft. Meigs Ditch and build a multi-use path. The city's General Fund covers about $754,000, with Sewer Funds picking up the rest. It needs a budget adjustment since bids opened later than planned.

1 mentionLast discussed Jan 28, 2026